# Find and bid government construction contracts

URL: https://us.falkview.com/industries/construction/
Updated: 2026-11-08

> **How does a construction company find and win government contracts?**
>
> Federal construction projects are posted on SAM.gov under NAICS 236, 237 and 238 codes; states, cities, counties and school districts post their own. Falkview finds the projects that fit your trades, size and bonding, checks set-aside eligibility, builds the compliance matrix and drafts the technical volume for your team to review.

## Key facts

- Federal construction contracts over $2,000 fall under the Davis-Bacon Act: workers must be paid at least the locally prevailing wages and fringe benefits in the wage decision.
- Performance and payment bonds are required on federal construction contracts above the Miller Act threshold in FAR Part 28.
- On a small business set-aside, a general construction prime may pay no more than 85% of the contract amount to subcontractors that are not similarly situated; a specialty trade prime, 75%.
- Most federal construction is bought by the Department of Defense, mainly the Army Corps of Engineers and Naval Facilities Engineering Systems Command, followed by GSA and the VA.

## Where are government construction projects posted?

Federal projects are on SAM.gov Contract Opportunities, usually with the drawings and specifications attached. State departments of transportation, public works departments, school districts and housing authorities post theirs on their own portals.

- Search SAM.gov by your NAICS codes (for example 236220 for commercial building or 238220 for mechanical) and filter by set-aside and place of performance.
- Watch presolicitation notices and sources sought: they show the magnitude of construction, which tells you early whether a project fits your bonding.
- Multiple award task order contracts (MATOCs) are common for construction. Getting on one means competing again for each task order.

## Which rules shape a federal construction bid?

Davis-Bacon wages, Miller Act bonds, the limitations on subcontracting for set-asides, and the solicitation's own evaluation method: sealed bidding on price alone, or a best-value tradeoff with technical and past performance factors.

- Davis-Bacon: the wage decision attached to the solicitation sets minimum wages and fringe per craft for the county. Certified payrolls are due weekly during performance.
- Bonds: bid guarantees and performance and payment bonds follow FAR Part 28. Your surety's single and aggregate limits decide which projects you can bid.
- Design-build is usually bought in two phases: qualifications and past performance first, then technical and price proposals from a short list.

## How does Falkview help with these bids?

Falkview does the reading, the checks and the first drafts. Price the work from your own estimate: Falkview's automatic wage build-up reads Service Contract Act determinations, not Davis-Bacon wage decisions.

- Watches SAM.gov every day for your NAICS and PSC codes, set-asides and states, and adds the state and local bid notices you forward.
- Reads the whole package, Sections C, L and M and every attachment, and builds a compliance matrix where each line cites its page and section.
- Checks each notice's set-aside and size standard against your SAM.gov registration by UEI, and warns when the registration runs out before the due date.
- Drafts the technical volume, management plan and past performance narratives from your own project sheets, résumés and safety and quality plans.
- Imports your price list or rate sheet from Excel or CSV, matches it to the solicitation's line items and fills in a copy of the buyer's own Excel price sheet.
- You review, sign and submit. Falkview never submits a bid or signs representations and certifications.

## Questions

### Can Falkview estimate a construction project for us?

No. Takeoffs and estimating stay with your estimator. Falkview reads the solicitation, builds the compliance matrix, checks eligibility and drafts the narrative volumes, and can fill the buyer's Excel bid schedule from your own unit prices.

### Does Falkview read drawings?

Falkview reads the solicitation text, specifications and attachments in PDF, Word and Excel. It does not do quantity takeoffs from drawings.

## Sources

- [SAM.gov Contract Opportunities](https://sam.gov/content/opportunities)
- [U.S. Department of Labor: Davis-Bacon and Related Acts](https://www.dol.gov/agencies/whd/government-contracts/construction)
- [FAR Part 28: Bonds and insurance](https://www.acquisition.gov/far/part-28)
- [FAR Part 36: Construction and architect-engineer contracts](https://www.acquisition.gov/far/part-36)
- [13 CFR 125.6: limitations on subcontracting](https://www.ecfr.gov/current/title-13/section-125.6)

---

Falkview US finds federal, state and local solicitations, scores them, builds the compliance matrix and price build-up, and drafts proposals from a company's own documents. People review and submit. Book a demo: https://us.falkview.com/contact/
